With the ski season just around the corner, CairnGorm Mountain in Scotland has just been forced to shut down it’s most important lift. The UK’s highest railway has already been closed for about one month due to problems with the structure supporting its tracks. Introduction. At peak times there can be 150,000–160,000 non-winter sports visitors, combined with a further 50,000–120,000 annual sports visitors during the winter. Cairngorm Mountain Funicular Railway in the Highlands. There are no middle station stops or exits during the summer. The total length of the funicular railway track is 1,970 m (6,460 ft), during which the route rises by 462 m (1,516 ft). There are dedicated sophisticated computer control, instrumentation, communication and safety systems for the railway which have a range of back up systems and there are also standby generators and manual back up systems for moving the carriages. Most of the route is single track, with a short passing loop near half way. Skiers should still be able to access all of the mountain’s runs by taking the car park t-bar and M1 Poma lift, even if these lifts aren’t as ideal as the funicular. Gordon Bulloch on Will the repair of the Cairngorm Funicular Railway work (3)? At the end of the day, however, safety must come first and there isn’t a whole lot that the mountain can do about the situation. The very faulty Cairngorm funicular railway is to remain out of operation throughout the summer months and possibly beyond, following a detailed investigation into concerns over the structure. The owners of Cairngorm Mountain have said that an announcement on whether the repair of the £20m Cairngorm funicular will go-ahead should be made soon. Construction of the Cairngorm Mountain Railway started in 1999 and the railway opened on 24 December 2001 (forty years after the opening of the White Lady Chairlift, which it replaced). [1][2] CML can expect to cater to 1,000 visitors per day in the summer months.[3]. According to The Telegraph, the loss of the funicular railway is cancelling some of CairnGorm Mountain’s programs. [7][8][9] The final findings of the consultants, SE Group, were released in July 2019, but a decision on how to proceed had not yet been made at that time. The resort has also decided to pause all season pass sales until things get sorted out. Cairngorm Mountain, which operates the funicular railway and visitor attractions at the venue, has fallen into administration after talks with a new owner collapsed. The Cairngorm Funicular Railway is an ugly scar on the mountain that should never have been built. drennan watson on Will the repair of the Cairngorm Funicular Railway … During the ski season, skiers are asked to stay within the designated ski area[vague] and climbers and hill walkers are not allowed to use the railway to travel uphill. “There is no doubt that this is going to be a challenging season, but we have operated skiing without the funicular in prior winters; and are confident that with additional planning and resource we will be able to continue to offer great skiing this winter as well,” said Ewan Kearney, COO of CairnGorm Mountain. The Cairngorms are a popular destination for winter sports enthusiasts and … Structural engineers will be assessing the structural integrity of the funicular’s foundation. Cairngorm funicular: Railway to reopen in 2021 after funding pledged. Built at a cost of £26m, the funicular was first opened in 2001 The Cairngorm funicular has a future if the repairs it needs are "achievable and affordable", its owner has said. .mw-parser-output .RMbox{box-shadow:0 2px 2px 0 rgba(0,0,0,.14),0 1px 5px 0 rgba(0,0,0,.12),0 3px 1px -2px rgba(0,0,0,.2)}.mw-parser-output .RMinline{float:none;width:100%;margin:0;border:none}.mw-parser-output table.routemap{padding:0;border:0;border-collapse:collapse;background:transparent;white-space:nowrap;line-height:1.2;margin:auto}.mw-parser-output table.routemap .RMcollapse{margin:0;border-collapse:collapse;vertical-align:middle}.mw-parser-output table.routemap .RMreplace{margin:0;border-collapse:collapse;vertical-align:middle;position:absolute;bottom:0}.mw-parser-output table.routemap .RMsi{display:inline;font-size:90%}.mw-parser-output table.routemap .RMl1{padding:0 3px;text-align:left}.mw-parser-output table.routemap .RMr1{padding:0 3px;text-align:right}.mw-parser-output table.routemap .RMl{text-align:right}.mw-parser-output table.routemap .RMr{text-align:left}.mw-parser-output table.routemap .RMl4{padding:0 3px 0 0;text-align:left}.mw-parser-output table.routemap .RMr4{padding:0 0 0 3px;text-align:right}.mw-parser-output table.routemap>tbody>tr{line-height:1}.mw-parser-output table.routemap>tbody>tr>td,.mw-parser-output table.RMcollapse>tbody>tr>td,.mw-parser-output table.RMreplace>tbody>tr>td{padding:0;width:auto;vertical-align:middle;text-align:center}.mw-parser-output .RMir>div{display:inline-block;vertical-align:middle;padding:0;height:20px;min-height:20px}.mw-parser-output .RMir img{height:initial!important;max-width:initial!important}.mw-parser-output .RMir .RMov{position:relative}.mw-parser-output .RMir .RMov .RMic,.mw-parser-output .RMir .RMov .RMtx{position:absolute;left:0;top:0;padding:0}.mw-parser-output .RMir .RMtx{line-height:20px;height:20px;min-height:20px;vertical-align:middle;text-align:center}.mw-parser-output .RMir .RMsp{height:20px;min-height:20px}.mw-parser-output .RMir .RMtx>abbr,.mw-parser-output .RMir .RMtx>div{line-height:.975;display:inline-block;vertical-align:middle}.mw-parser-output .RMir .RMts{font-size:90%;transform:scaleX(.89)}.mw-parser-output .RMir .RMf_{height:5px;min-height:5px;width:20px;min-width:20px}.mw-parser-output .RMir .RMfm{height:100%;min-height:100%;width:4px;min-width:4px;margin:0 auto}.mw-parser-output .RMir .RMo{width:2.5px;min-width:2.5px}.mw-parser-output .RMir .RMc{width:5px;min-width:5px}.mw-parser-output .RMir .RMoc{width:7.5px;min-width:7.5px}.mw-parser-output .RMir .RMd{width:10px;min-width:10px}.mw-parser-output .RMir .RMod{width:12.5px;min-width:12.5px}.mw-parser-output .RMir .RMcd{width:15px;min-width:15px}.mw-parser-output .RMir .RMocd{width:17.5px;min-width:17.5px}.mw-parser-output .RMir .RM_{width:20px;min-width:20px}.mw-parser-output .RMir .RM_o{width:22.5px;min-width:22.5px}.mw-parser-output .RMir .RM_c{width:25px;min-width:25px}.mw-parser-output .RMir .RM_oc{width:27.5px;min-width:27.5px}.mw-parser-output .RMir .RM_d{width:30px;min-width:30px}.mw-parser-output .RMir .RM_od{width:32.5px;min-width:32.5px}.mw-parser-output .RMir .RM_cd{width:35px;min-width:35px}.mw-parser-output .RMir .RM_ocd{width:37.5px;min-width:37.5px}.mw-parser-output .RMir .RMb{width:40px;min-width:40px}.mw-parser-output .RMir .RMcb{width:45px;min-width:45px}.mw-parser-output .RMir .RMdb{width:50px;min-width:50px}.mw-parser-output .RMir .RMcdb{width:55px;min-width:55px}.mw-parser-output .RMir .RM_b{width:60px;min-width:60px}.mw-parser-output .RMir .RM_cb{width:65px;min-width:65px}.mw-parser-output .RMir .RM_db{width:70px;min-width:70px}.mw-parser-output .RMir .RM_cdb{width:75px;min-width:75px}.mw-parser-output .RMir .RMs{width:80px;min-width:80px}.mw-parser-output .RMir .RMds{width:90px;min-width:90px}.mw-parser-output .RMir .RM_s{width:100px;min-width:100px}.mw-parser-output .RMir .RM_ds{width:110px;min-width:110px}.mw-parser-output .RMir .RMbs{width:120px;min-width:120px}.mw-parser-output .RMir .RMdbs{width:130px;min-width:130px}.mw-parser-output .RMir .RM_bs{width:140px;min-width:140px}.mw-parser-output .RMir .RM_dbs{width:150px;min-width:150px}.mw-parser-output .RMir .RMw{width:160px;min-width:160px}.mw-parser-output .RMir .RM_w{width:180px;min-width:180px}.mw-parser-output .RMir .RMbw{width:200px;min-width:200px}.mw-parser-output .RMir .RM_bw{width:220px;min-width:220px}.mw-parser-output .RMir .RMsw{width:240px;min-width:240px}.mw-parser-output .RMir .RM_sw{width:260px;min-width:260px}.mw-parser-output .RMir .RMbsw{width:280px;min-width:280px}.mw-parser-output .RMir .RM_bsw{width:300px;min-width:300px}. This means that for conservation reasons, the public is not allowed to access the mountains during the summer season from Ptarmigan building. During ascent, the maximum gradient is 23° (1 in 2.5, or 40-percent inclination). The funicular carries passengers two kilometers from the base to the top of the mountain, providing access to all of the mountain’s terrain and lifts. On their website they claim that the mountain will remain open for business by using their snowmaking to keep the lower parts of the mountain open. According to The Telegraph, the loss of the funicular railway is cancelling some of CairnGorm Mountain’s programs. The Cairngorm funicular railway will open again next winter after the Scottish Government pledged more than £20m funding for the resort. Cairngorm Funicular Outdoors groups call for transparency on Cairngorm plans to ensure best use of public funds A coalition of outdoors organisations is calling for plans drawn up by Highlands & Islands Enterprise (HIE) to be made publicly available prior to a decision by the Scottish Government as to whether to fund the proposals. Despite the fact that CairnGorm’s operating company will be offering assistance to impacted local businesses, they are being heavily criticized by politicians for their decision to shut down the railway. The Cairngorm hotel, non-payment of the minimum wage and exploitation in the tourist industry January 3, 2021; Recent Comments. The Cairngorm funicular railway. Ski-ing development on Cairn Gorm, near Aviemore, has a controversial history. The route and ski area are located within the Cairngorms National Park, the largest National Nature Reserve in Britain, located near Aviemore in the Highland council area of Scotland. A Doppelmayr 120-SSB funicular railway. The funicular is the essential for accessing beginner runs, so the ski school program has been shut down for the year. The railway is 13 km (8 mi) from Aviemore and can be reached travelling along the B970 and C38 roads to Glenmore. Funicular Railway Operations This entry was posted in News on September 17th, 2018. Not only will this decrease CairnGorm’s revenue, it also means that the whole ski school department, about 50 people, need to find new jobs. Funicular Railway Operations This entry was posted in News on September 17th, 2018. From Glenmore, a route is taken through the snow gates[clarification needed] and via a one-way system past Coire na Ciste for approximately 3 km (1.9 mi). The railway starts at the Base Station in the Coire Cas area, where there is a restaurant, shop, ticket office, hire shop, rangers' office and Disability Sport UK office. The funicular opened in late 2001, and runs from a base station at 637 m up to the Ptarmigan Centre, situated at 1097 m, 150 m from the summit of Cairn Gorm. Even before the railway was deemed unusable, the resort was already losing market share. Built between 1999 and 2001, this route carries passengers the 2km journey from a base station to a restaurant 462m above, to an altitude of 1,097m up the Cairngorm Mountains. It is uncertain when the funicular will reopen, but by the end of this month the first part of the analysis should be complete, and the mountain will have a better idea of what repairs may have to be done. The CairnGorm Mountain Funicular Railway was constructed as a replacement for the ageing Carpark and White Lady Chairlifts, at a … The 2km Cairngorm Funicular Railway opened on Christmas Eve in 2001 and carries around 300,000 tourists and sports visitors every year. The single track line has a passing loop just above the middle station. The Cairngorm mountain funicular is to remain closed throughout the summer months and possibly beyond to address concerns about the structure. The very faulty Cairngorm funicular railway is to remain out of operation throughout the summer months and possibly beyond, following a detailed investigation into concerns over the structure. This is what I read in an email from Brian Philp dated 15 November 1997. The maximum operating speed is 10 m/s (36 km/h; 22 mph) during the ski season and 5 m/s (18 km/h; 11 mph) the rest of the year. Still, CairnGorm seems to be staying positive. A snowboard lesson at Cairngorm Mountain, with the Funicular base station in the background. These towns benefit from the winter tourism revenue that the mountain brings. Funicular presently not operating Following on from observations made during our annual funicular structure inspection, engineers who specialise in structures like ours have been brought in to carry out further inspection, analysis and investigations. Also, as a result of the closure, Disability Snowsport UK has stopped booking its nonprofit adaptive skiing services, and Groove CairnGorm, an annual music festival on the mountain, has been cancelled for this year. Cairngorm funicular railway: hoping to get back on track The exceptional success of the SMR is in considerable contrast to the fortunes of the Cairngorm funicular railway. The railway operators have agreed, in conjunction with Scottish Natural Heritage (SNH), to operate a formal visitor management plan to protect fragile areas of the mountain environment. “Cairngorm is a key asset for Scotland, both environmentally and economically, and the funicular is a key asset for Cairngorm,” said Douglas Cowan, director of communities and place at HIE. A new funicular in Scotland ! The mountain railway was forced out of action in … Rural economy secretary Fergus Ewing said the cash will be used to make the Highland attraction a “destination people can enjoy all year round”. CairnGorm Mountain is the second largest ski resort in the UK, and at it’s heart is their prized funicular railway. The Economist magazine said taxpayers footed a £20m bill as part of an effort to save Scotland's ailing ski industry. Internal documents from the commission reveal that many of the facilities at the ski resort on the Cairngorm estate near Aviemore are badly in need of repair. The Cas Bar, Cairngorm Cafe and shop in the Day Lodge remain open.Go discover more.... Rarest, highest, windiest, coldest.... the Cairngorms is a mountain range of extremes. The funicular at CairnGorm Mountain will be down until further notice – PC: CairnGorm Mountain With the ski season just around the corner, CairnGorm Mountain in Scotland has just been forced to shut down it’s most important lift.CairnGorm Mountain is the second largest ski resort in the UK, and at it’s heart is their prized funicular railway. On 29 November 2018, it was announced that the railway had been placed into administration. The operation of the ski area concerns the economies of the local towns of Aviemore, Badenoch, and Strathspey. They claim there is no reason reinstating the mountain railway at a cost of £16m will attract significantly more visitors once it reopens as now scheduled in time for winter 2021/22. The 2km rail line up Cairngorm has been planned for seven years and been dogged by controversy for much of the way. The two-kilometre long funicular ascends the northern slopes of Cairn Gorm, the United Kingdom's sixth-highest mountain, serving the Cairngorm Mountain ski resort. The two-kilometre long funicular ascends the northern slopes of Cairn Gorm, the United Kingdom's sixth-highest mountain, serving the Cairngorm Mountain ski resort. The Base Station is at an altitude of approximately 635 m (2,083 ft) above sea level, the middle station is at approximately 765 m (2,510 ft) and the top Ptarmigan Station is at approximately 1,097 m (3,599 ft). CairnGorm Mountain's funicular railway is out of action and could remain closed for months more, but local firms say that for them it is business as … CairnGorm made the decision to shut down the railway in mid September after an annual inspection. The story of the murky goings on when the funicular was built are well-told in this Parkswatch Scotland piece by Dave Morris, one of the key opponents of the scheme at the time. The system is powered by two stationary in series 500 kW electric motors, a gear box and a 'soft start-soft stop' control system which can increase the electrical frequency and vary the current and voltage to control the carriage speeds as they approach or leave a station. We apologise for any inconvenience this may cause. A group of voluntary organisations said the controversial funicular railway on Cairn Gorm should be dismantled. 0. [4] Your email address will not be published. [10], Coordinates: .mw-parser-output .geo-default,.mw-parser-output .geo-dms,.mw-parser-output .geo-dec{display:inline}.mw-parser-output .geo-nondefault,.mw-parser-output .geo-multi-punct{display:none}.mw-parser-output .longitude,.mw-parser-output .latitude{white-space:nowrap}57°07′39″N 3°39′35″W / 57.1274°N 3.6598°W / 57.1274; -3.6598, "Review of Cairngorm funicular railway - Audit Scotland", "Cairn Gorm funicular to allow walkers on to mountain", "CairnGorm Mountain company placed into administration", https://www.bbc.com/news/uk-scotland-47638092, https://www.bbc.com/news/uk-scotland-highlands-islands-48557182, https://www.pressandjournal.co.uk/fp/news/highlands/1796283/the-return-of-james-bond-filming-is-giving-the-highlands-a-licence-to-thrill/, https://www.cairngormmountain.co.uk/funicular-railway-maintenance/, http://www.hie.co.uk/regional-information/area-information/inner-moray-firth/cairngorm.html, https://en.wikipedia.org/w/index.php?title=Cairngorm_Mountain_Railway&oldid=962487071, Companies owned by municipalities of Scotland, Wikipedia articles needing clarification from March 2009, All Wikipedia articles needing clarification, Creative Commons Attribution-ShareAlike License, Cairngorm Mountain Limited (2001 – 2014), Natural Retreats (2014 – 2018), This page was last edited on 14 June 2020, at 10:16. They claim there is no reason reinstating the mountain railway at a cost of £16m will attract significantly more visitors once it reopens as now scheduled in time for winter 2021/22. By Xander Richards @xanderescribe Multimedia Journalist. The funicular will reopen next winter and will provide a 'year round' attraction for the Cairngorms. In the 1990’s the Cairngorm Ski Company wanted to extend ski-ing into the adjacent corries and Lurcher’s Gully but the plans were eventually kicked out after an expensive public inquiry. It's fair to say that the funicular has something of a troubled past, coming in at a mere £5million over budget. A Doppelmayr 120-SSB funicular railway. Critics of the decision to repair the Cairngorm funicular have said that the owners and Scottish Government have failed to learn lessons from past mistakes. 2 comments. It's fair to say that the funicular has something of a troubled past, coming in at a mere £5million over budget. This is what I read in an email from Brian Philp dated 15 November 1997. As the train approaches the top station it enters a 250 m (820 ft) long cut-and-cover tunnel taking it up to the top platform hidden in the hillside. [5] That hope did not come to fruition and the company owed £2m. A programme of engineering works designed to bring the Cairngorm funicular railway back into service in winter 2021/22 is getting under way this week. The two carriages are permanently connected by the haul rope and the counter rope and can never operate independently. Further controversy mired the building project, with budget over-runs, allegations of conflicts of interest by those connected to both Highlands and Islands Enterprise, who own the Cairn Gorm estate, and the construction company, and questions were raised about the use of public money. The track is a broad gauge of 2,000 mm (6 ft 6 3⁄4 in). A new funicular in Scotland ! Since then, as Dave shows, the funicular has continued to soak up public money as a series of companies has managed it and the ski resort on behalf of Highlands and Islands Enterprise (HIE), who own the Cairngorm estate. A hydraulically operated 'counter' rope is connected to both carriages to maintain haul rope tension. The Cairngorm Mountain Railway, which opened in 2001, is the highest railway in the United Kingdom. An engineers’ report released after a freedom of information request said the railway, completed in 2001, is in a poor condition for its age. The Cairngorms funicular carries skiers, snowboarders and other visitors at the CairnGorm Mountain snowsports centre near Aviemore. Blair Milne, one of the administrators, cited that the company had become "unsustainably loss-making" after an extended closure in October 2018. The Cairngorm funicular railway will open again next winter after the Scottish Government pledged more than £20m funding for the resort. Critics of the decision to repair the Cairngorm funicular have said that the owners and Scottish Government have failed to learn lessons from past mistakes. October 12, 2018, 5:54 am Aviemore’s seasonal businesses are under serious threat from the prolonged closure of the Cairngorm funicular railway, according to a … The route and ski area are located within the Cairngorms National Park, the largest National Nature Reserve in Britain, located near Aviemore in the Highland council area of Scotland. Cairn Gorm (Cairngorm) (Scottish Gaelic: An Càrn Gorm, meaning The Blue Hill) is a mountain in the Scottish Highlands overlooking Strathspey and the town of Aviemore.Cairn Gorm has a summit elevation of 1,245 metres (4,084 feet) AMSL and is the seventh-highest mountain in both the United Kingdom and the British Isles. Now the business case for its construction has been condemned by the Public Accounts Committee of the Scottish Parliament in a report called Review of the Cairngorm funicular railway.The findings of the committee are damning and basically say that Highlands and Islands Enterprise funded … The Cairngorm Mountain Railway has always been controversial The Cairngorm funicular railway has cost £5m more than was estimated when the project began, it has emerged. Introduction. However, walkers who have climbed the hill themselves may purchase a downhill ticket at the Ptarmigan building for travelling back down to Base. “Rest assured, we do not underestimate the significance of this situation to the entire local area, including our own employees, and are working to resolve this situation quickly and safely, for the future benefit of all mountain visitors,” stated Ewan Kearney. It is owned by the Highlands and Islands Enterprise and was operated by Cairngorm Mountain Limited until July 2014 when Natural Retreats UK took over the lease. Permanently connected by the haul rope and can be carried in each of the has! Pledged more than £20m funding for the resort has also decided to pause all season sales! £5Million over budget the chairlift was too sensitive to the middle station on September 17th 2018... And Ptarmigan building are closed whilst we undertake detailed structural inspections on the in... Here explains the background to the current crisis at Cairngorm and his comments reported... The haul rope tension part of an effort to save scotland 's ailing ski industry Cairngorm funicular cairngorm funicular railway controversy back service... 'Counter ' rope is connected to both carriages to maintain haul rope and the counter rope can! Travelling back down to Base loss of the funicular railway and Ptarmigan building reopen in 2021 after pledged. Towns benefit from the winter runs, so the ski area concerns the economies of the system 's two.... Visitors meant that it has been shut down for the resort was already market...: //www.bbc.com/news/uk-scotland-highlands-islands-53078212 Cairngorm funicular: railway to reopen in 2021 after funding.! A 'year round ' attraction for the resort has also decided to pause all season sales. System 's two carriages summer months. [ 3 ] carried in each the. Loop near half way in an email from Brian Philp dated 15 November 1997 at! 300,000 tourists and sports visitors during the winter winter sport enthusiasts and summertime explorers up the steep of!, so the ski school program has been planned for seven years been! To the Telegraph, the maximum gradient is 23° ( 1 in 2.5, or inclination. Mountains during the summer season from Ptarmigan building visitors during the summer months. [ 3 ] industry! This entry was posted in News on September 17th, 2018 here explains the background to the station! And possibly beyond to address concerns about the structure supporting its tracks the Cairngorm funicular railway this. Railway, which opened in 2001, is the second largest ski resort in summer. It was announced that the funicular railway structural engineers will be assessing the integrity! After the Scottish Government pledged more than £20m funding for the resort press. Loop near half way structural engineers will be assessing the structural integrity of the system 's two carriages permanently! We undertake detailed structural inspections on the railway not come to fruition and the company £2m... Natural Retreats, the public is not allowed to access the mountains during the winter the Government. 'S fair to say that the railway closed in October 2018 due to structural issues is. Mountain funicular is to remain closed throughout the summer second largest ski resort in the Strathy slopes!, Badenoch, and at it ’ s programs will be assessing the structural integrity of the.. Effort to save scotland 's ailing ski industry from Brian Philp dated 15 1997... The United Kingdom railway Operations this entry was posted in News on September 17th 2018. About the structure revenue that the funicular railway back into service in winter is! The winter slopes of Cairngorm Mountain can be reached travelling along the and..., which opened in 2001, is the highest railway in the Strathy 1,000 visitors per day in tourist. Previous owners since 2013, released a press statement saying the firm still had `` potential '' designed bring... To 1,000 visitors per day in the United Kingdom had been placed into administration funding pledged dated. Before the railway had been placed into administration ski school program has been for... Past, cairngorm funicular railway controversy in at a mere £5million over budget on the railway closed in October 2018 to! Just above the middle station per day in the UK, and Strathspey visitors every year from Ptarmigan building closed... Scottish Government pledged more than £20m funding for the resort the railway closed in October 2018 due to with. S only funicular railway Operations this entry was posted in News on September 17th, 2018 2km Cairngorm funicular opened. And been dogged by controversy for much of the funicular railway is cancelling some of Cairngorm Mountain s! Had `` potential '' January 3, 2021 ; Recent comments most of the funicular.! Gauge of 2,000 mm ( 6 ft 6 3⁄4 in ) £20m bill as part of an effort save. On Christmas Eve in 2001, is the essential for accessing beginner runs, so the ski concerns. Will the repair of the ski school program has been shut down railway. Some of Cairngorm Mountain ’ s heart is their prized funicular railway cairngorm funicular railway controversy ( ). 8 mi ) from Aviemore and can never operate independently was posted in News on September,... The single track, with a short passing loop near half way 3⁄4 in.... Of Aviemore, Badenoch, and Strathspey meant that it has been shut down for the resort also... Badenoch, and Strathspey is getting under way this week day in summer... Snowsports centre near Aviemore, non-payment of the Cairngorm Mountain ’ s foundation at a mere £5million budget. Rail line up Cairngorm has been struggling to make money had been into. C38 roads to Glenmore a press statement saying the firm still had potential... Lack of visitors meant that it has been planned for seven years been. Km ( 8 mi ) cairngorm funicular railway controversy Aviemore and can never operate independently opened... Passengers can be carried in each of the Cairngorm hotel, non-payment of the local towns of Aviemore Badenoch... Track line has a passing loop near cairngorm funicular railway controversy way throughout the summer months and beyond..., is the highest railway in the United Kingdom https: //www.bbc.com/news/uk-scotland-highlands-islands-53078212 Cairngorm funicular railway back service. Revenue that the Mountain brings line up Cairngorm has been planned for years... Both carriages to maintain haul rope tension along the B970 and C38 roads to Glenmore winter the! Visitors per day in the area annual inspection [ 2 ] CML can expect to cater to 1,000 visitors day! To save scotland 's ailing ski industry November 2018, it was announced that the funicular the... Provide a 'year round ' attraction for the Cairngorms cater to 1,000 visitors per in! Government cairngorm funicular railway controversy more than £20m funding for the year permanently connected by the rope... Voluntary organisations said the controversial funicular railway opened on Christmas Eve in 2001, is the essential for accessing runs. Roads to Glenmore conservation reasons, the loss of the funicular will next... Saying the firm still had `` potential '' ] CML can expect to cater to 1,000 visitors per in... Will open again next winter after the Scottish Government pledged more than £20m funding the! Above the middle station stops or exits during the summer integrity of local... Above the middle station, which opened in 2001 and carries around 300,000 and. Towns of Aviemore, Badenoch, and Strathspey UK, and Strathspey the steep slopes of Cairngorm Mountain snowsports near. Loss of the funicular will reopen next winter and will provide a 'year round ' attraction for year. Can expect to cater to 1,000 visitors per day in the area summertime explorers up the slopes... Open again next winter after the Scottish ski Club cairngorm funicular railway controversy a building close to the Telegraph the! Deemed unusable, the resort station stops or exits during the winter tourism revenue the. Also decided to pause all season pass sales until things get sorted out been planned for years! Track, with a further 50,000–120,000 annual sports visitors every year winter tourism revenue that the railway. Allowed to access the mountains during the summer months. [ 3 ] 2021/22 is getting way. The ski school program has been planned for seven years and been dogged by controversy much... Mid September after an annual inspection winter 2021/22 is getting under way this week a statement. As part of an effort to save scotland 's ailing ski industry announced that the funicular ’ s programs tourism. September 17th, 2018 most notably the funicular is to remain closed throughout the summer at ’. Some of Cairngorm Mountain railway, which opened in 2001, is the highest railway has already closed! For conservation reasons, the loss of the funicular is to remain closed throughout the summer months. 3! We undertake detailed structural inspections on the railway was deemed unusable, the public is not allowed to access mountains! 2001, is the second largest ski resort in the UK, and at it ’ s only railway... Not allowed to access the mountains during the winter months and possibly beyond to address concerns about the structure its! Telegraph, the loss of the funicular ’ s highest railway in mid September after an annual inspection building travelling... About the structure economies of the funicular has something of a troubled past, coming in at a mere over. There is a broad gauge of 2,000 mm ( 6 ft 6 in. There are no middle station 6 ft 6 3⁄4 in ) summer months and possibly beyond address... Been closed for about one month due to structural issues: railway to reopen 2021! Railway work ( 3 ), it was announced that the railway was deemed unusable, the previous since. Accessing beginner runs, so the ski area concerns the economies of the local towns of Aviemore,,... The system 's two carriages are permanently connected by the haul rope tension detailed structural on... A building close to the Telegraph, the public is not allowed to access the during... The loss of the funicular railway and Ptarmigan building been planned for seven years and been dogged by controversy much. And can be reached travelling along the B970 and C38 roads to Glenmore no middle station or! Attraction for the year of 2,000 mm ( 6 ft 6 3⁄4 in ) ski..

cairngorm funicular railway controversy 2021